Who it is for
Multi-site operators
One site is a filing problem. Twenty is a visibility problem, and the answer is not twenty spreadsheets rolled up by somebody on a Friday.
What usually applies
A starting point, not a determination. Which of these actually lands on your register depends on the building and how it is used, which is what the applicability questions are for.
Fire safety Legionella Electrical safety Gas safety Asbestos Health and safety
What tends to matter here
- Duties are seeded per building from that building's own attributes, so sites genuinely differ instead of everybody getting the same checklist.
- The RAG grid shows sites against regimes; a cell links straight to the register rows behind it.
- Central chasing with local completion — head office sees the gap, site staff close it on a phone.
- Packs built per site, per regime, or for the whole estate.